The design of the North-West T-way is a key aspect in the delivery of this important piece of public transport infrastructure. Detailed design of various aspects of the North-West T-way is currently underway with design, construction and some maintenance activities overlapping throughout the project’s delivery. |
|
 |
 |
 |
 |
 |
 |
Detailed Design Phase |
|
 |
 |
The detailed design phase develops the concept design from the Environmental Impact Assessment and Preferred Activity Report so that the T-way can be constructed. |
|
 |
 |
 |
 |
 |
 |
Design Features |
|
 |
 |
 |
 |
 |
 |
Parramatta–Rouse Hill |
|
|
 |
14 km of dedicated bus only roads |
|
|
 |
3 km of dedicated bus only lanes on existing roads |
|
|
 |
20 T-way stations |
|
|
 |
5 bridges |
|
|
 |
One pedestrian/cycleway bridge |
|
|
 |
2 park and ride stations |
|
|
 |
3 underpasses (one already constructed; one being constructed as part of another project) |
|
|
 |
4 km of noise barriers |
|
|
 |
285 ha landscaping
 |
|
|
|
Blacktown–Parklea |
|
|
 |
7 km of dedicated bus only roads |
|
|
 |
0.5 km of dedicated bus only lanes on existing roads |
|
|
 |
10 T-way stations |
|
|
 |
One dedicated pedestrian bridge |
|
|
 |
4 km of noise barriers |
|
|
 |
90 ha landscaping
 |
|
|
 |
The North-West T-way is expected to be open for bus services by late 2007. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |